Footbridge over Abbey Road, London

We had an interesting job in London recently, a client needed a footbridge removed in one complete section from over Abbey Road in London.  We used our large AC140 mobile crane with its impressive 140 tonnes MRC to successfully complete the job.  With a width of just 2.75m and a length of just 11.7m, the AC140 is one of the most powerful cranes there is for its size.  It is like a large ant of the mobile crane world with a big main boom reaching out to an amazing 60 meters.
The customer needed the bridge taken down in one complete section so they could recycle it in the best possible way.  It took a day to complete and the customer was left happy and impressed with the way the job was handled thanks to our professional driver and crew.