Our newest Demag AC45 was required in Somerset to install a large overhead crane into a building with a low ceiling. Normally cranes require a clearance height above a load’s final position for the boom and lifting tackle to occupy while the lift takes place. With our specially designed runner we can install our customers’ payloads a lot closer into a building’s roof space. Using this runner saves our customers’ money and time during the installation.
You may also like
Someone sent in this video they discovered on youtube of Terranova helping with the delivery of the new John Pinkerton II canal […]
We called on our lifting partners Bronzeshield to assist in completing a demolition job at NGTE Pyestock, near Fleet, in Hampshire. If […]
Terranova Cranes have been assisting Barnet NHS hospital in London with the rapid construction of an another emergency ward. Trust Managers hope […]
In the fight against the Covid-19 virus, Terranova Cranes has been helping the Wrightington Wigan and Leigh NHS Foundation Trust in the […]